← Back to Malaysia
business

RM60m bridge approved to link RTS, KTM stations in JB

RM60m bridge approved to link RTS, KTM stations in JB
Image: Reddit

What happened

Malaysia approved a RM60 million bridge to connect the RTS Link's Bukit Chagar station with the KTM Komuter JB Sentral station in Johor Bahru. The direct link will let commuters transfer between the two rail systems without leaving the stations.

Construction is expected to take 12 months. No start date was given.

In numbers
RM60 million
Project cost
paultan.org ↗
12 months
Construction duration
paultan.org ↗

Why it matters

The RTS Link is a cross-border rail project between Johor Bahru and Singapore, with Bukit Chagar as its Malaysian terminus. The bridge removes the need to exit and re-enter stations, cutting transfer time.

The link also ties Malaysia's rail network more closely to the RTS Link, a step toward easing congestion on the Causeway, one of the world's busiest land crossings.

Impact on Malaysia

The project boosts Johor's role as a regional transport hub. Better connectivity may raise ridership on both the RTS Link and KTM Komuter services.

Local businesses near Bukit Chagar could see more foot traffic. The bridge supports Malaysia's push for better public transport in major cities.

Timeline and construction

The bridge is set to be built within 12 months. The sheltered walkway will protect commuters from weather.

Context and background

The RTS Link is a 4 km shuttle connecting Bukit Chagar to Woodlands North in Singapore. It is expected to cut cross-border travel time and reduce traffic on the Causeway.

KTM Komuter JB Sentral is a hub for Malaysia's rail network. The bridge is part of ongoing upgrades in Johor Bahru.

What's next

Authorities have not announced a construction start date. Once built, the bridge will provide a direct link between the two stations.

No further details on funding or contractors were released.

RTS LinkJohor BahruKTM Komuterinfrastructuretransport